Following a dispute between the Prithvi Highway Bus Entrepreneurs’ Committee (PHBEC) and West Nepal Bus Entrepreneurs’ Association (WNBEA) no vehicles were seen plying the Siddhartha Highway today.
KATHMANDU: A dry landslide at Siddababa, along the Siddhartha Highway has obstructed vehicular movement since this afternoon, in Palpa district. The five kilometres road stretch from lower Siddababa ...
The Kathmandu Post on MSN
Siddhartha Highway's Siddhababa tunnel work moving at snail's pace
Work on the Siddhababa Tunnel along the Siddhartha Highway is at a snail's pace with only 1.69 percent progress recorded over the past two months. Project engineers and residents alike are concerned ...
Hosted on MSN
Ten years on, Dobhan-Nuwakot road still stuck in mud
Palpa, Aug. 7 -- Ten years after the construction began, the Dobhan-Nuwakot road-designed as an alternative route to the landslide-prone Siddhababa section of Siddhartha Highway-remains unfinished.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results